Hi, i present my layout,is in full swing. First from left to right we have a small intermodal yard,then we have a yard center classification. Following thistwo accesses to the diesel maintenance yard ending with a turntable. In one of these accesses can be seen diverting doubleslip, which diverted a section of wineries that intend tobuild in the near future to create more game maneuvers loads,without hinderingthe flow on the main line.
are saying?
Regards
PabloSS71
are saying?
Regards
PabloSS71