NYC_George
Well-Known Member
Now that my bridge projects are done I decided to work on some car loads. I thought a gas main pipe load would be interesting.
Last edited:
Thanks Jerome. I would say about 4 hours total. Half the time is waiting for the paint and Insta-Cure glue to cure on the load straps.Very nice load George!! How long did that take you?