BigGRacing
Aka. Gary Russell
I thought that was the case when reading the previous posts but wanted to make sure.I bought and redid them
I thought that was the case when reading the previous posts but wanted to make sure.I bought and redid them
Immaculate photos, scenery and all round modelling!Trees are very time consuming. This section of 8' is completed with 50 pine trees and 12 autumn foliage. This is the result.
View attachment 171640
View attachment 171641
Thanks Lynn,Fantastic looking trees, when you say static grass them with 2mm static grass , are you using a static grass applicator? I’m interested as I’ve bought many trees online from china for cheap and sometimes just use hairspray and flock them up .
No it was from ebay, but you can go directly to Aliexpress. It's the same person.Was the source for the pine trees bought from China, Amazon?
It looks fantastic, cant wait to get to that stage.Just tried something different. I'm probably sure someone tried this before.
I drilled holes in a 45 degree angle every 1/2" on all 4 sides of a chopstick and then inserted tiny branches from super trees.
I then gave it a coat of spray paint, added a bit of fine turf and finished it with super leafs.
I didn't pay to much attention to the branches length and position because I just wanted to see how it would look and how the building of it would go.
What do you guys think???
View attachment 172174 View attachment 172175
Thanks Gary, no it's a Walthers kit which I had to kit bash to make it fit in the area.Totally awesome! Hawk, did you scratchbuild your lumber mill as well or did you have a plan? It looks a lot like a train shed that I still want to build.
Looks great, Hawkes. At 53 seconds I recognize that original dock you built several years ago, before the construction of the "big layout"I've been quiet due to a problem that needed HUGE attention. A clogged pipe needed to be replace, no damaged to the layout, just the ceiling. I needed to break the gyprock section of the ceiling, needed to remove the air duct near the wall for access than the plumber, then re-install the duct. Will redo the entire ceiling next year with 2" x 2" suspended tiles....... just in case.
View attachment 173459
In the mean time, It's been a while since my last video, so here's a silent update of what I consider finish on my layout. What you'll see is 40% of finished layout. Enjoy.
Thanks Dave, you've got a good memory, it was 8 years ago.Looks great, Hawkes. At 53 seconds I recognize that original dock you built several years ago, before the construction of the "big layout"
Bummer about the ceiling fiasco, you were pitched a real curve ball there.
Dave LASM
Thank you very much LynnLooking just fantastic, trees layout everything, the newest tree with the skewer and scenic express bushes came out great. I really should look into creating a valance . The person you bought the pine trees from on EBay and is the same as on Aliexpress, do you recall the name? Thanks.