Iron Horseman
Well-Known Member
Building the 2015 Christmas Forest.
First wash the floor.
Add some grass.
Create the track plan. As there will be no one to operate it this year it has to be simple. Must have been inspired by Tony this year. Went for a double track mainline.
Modify the track plan (from 5 loops to 4). Wire and assign the trains to their tracks. Test and add the station and water tower.
First wash the floor.
Add some grass.
Create the track plan. As there will be no one to operate it this year it has to be simple. Must have been inspired by Tony this year. Went for a double track mainline.
Modify the track plan (from 5 loops to 4). Wire and assign the trains to their tracks. Test and add the station and water tower.