A couple weeks back, I was asking about charging to build a layout for someone. Charging to Scenic a layout? By the way, thanks for all the input.
Well, here's the start of "EXTREME Makeover:Layout Edition"
I named the thread after the TV show because I am REALLY pressed for time on this project. The family is having a party on Jan 12. I only have 5 days to build this layout at the site. I am limited to working on it only on my days off from my main job. I can do some of the small building at home, but most of it is on the job site only type work.
The first day I took up all the track to start to layout out the new plan I came up with.
Old layout before I touched it.
A basic loop with a passing siding put 6ft away along the back wall.
Here's the proposed outcome
This is a quick sketch I did to get the idea on paper so the client could visualize it better. I made the track plan using Xtrkcad and Atlas Right Track program only for the 3-D view.
Well, here's the start of "EXTREME Makeover:Layout Edition"
I named the thread after the TV show because I am REALLY pressed for time on this project. The family is having a party on Jan 12. I only have 5 days to build this layout at the site. I am limited to working on it only on my days off from my main job. I can do some of the small building at home, but most of it is on the job site only type work.
The first day I took up all the track to start to layout out the new plan I came up with.
Old layout before I touched it.
A basic loop with a passing siding put 6ft away along the back wall.
Here's the proposed outcome
This is a quick sketch I did to get the idea on paper so the client could visualize it better. I made the track plan using Xtrkcad and Atlas Right Track program only for the 3-D view.