Cincinnati Union Station 1950 HO layout


crazyboysrc

Active Member
Well let the fun begin ,
well i went from a wall shelf layout to moving the pool table and opening up a hole room . this will be modeled like there would have been a stream liner world fair for a three day weekend in June 1950 with all the top steam stream liners of all the different RR would have come in with there best for fan picks and railfan trips on your favorite one so lets get this party started . plans are done . I will be putting the C&O 490 , SP Daylight , NYC Mercury , lehigh valley John Wilkes , Hiawatha Milwaukee road , N&W J 611 and many more as i build the layout i build up the more rolling stock . So thanks for watching and hope you enjoy ..
 
Just a few days of work . i will have some more pic this week coming
 

Attachments

  • 177992-a0bec81a1d7e302f6ca4c983a699a075.jpg
    177992-a0bec81a1d7e302f6ca4c983a699a075.jpg
    18.5 KB · Views: 70
  • 177997-2a394763e86ed591e37584075adb6a23.jpg
    177997-2a394763e86ed591e37584075adb6a23.jpg
    21.2 KB · Views: 79
  • 177996-fa31fdd3dd4e295979606761eaf5c278.jpg
    177996-fa31fdd3dd4e295979606761eaf5c278.jpg
    19.4 KB · Views: 71
  • 177998-36eafc2d93cfaf485de930d7ab2fce06.jpg
    177998-36eafc2d93cfaf485de930d7ab2fce06.jpg
    14 KB · Views: 68
  • 177999-f0c6df01b7005e47314070e4fbf51e07.jpg
    177999-f0c6df01b7005e47314070e4fbf51e07.jpg
    16.2 KB · Views: 65
  • 177995-d38fa3969a7b99ccc8bb4ad9b50af91c.jpg
    177995-d38fa3969a7b99ccc8bb4ad9b50af91c.jpg
    18.1 KB · Views: 63
  • 177995-d38fa3969a7b99ccc8bb4ad9b50af91c.jpg
    177995-d38fa3969a7b99ccc8bb4ad9b50af91c.jpg
    18.1 KB · Views: 63
  • 177993-6e7d9fa7660f31a430b288fa7d7bc3fb.jpg
    177993-6e7d9fa7660f31a430b288fa7d7bc3fb.jpg
    22.1 KB · Views: 79
Well let the fun begin ,
well i went from a wall shelf layout to moving the pool table and opening up a hole room . this will be modeled like there would have been a stream liner world fair for a three day weekend in June 1950 with all the top steam stream liners of all the different RR would have come in with there best for fan picks and railfan trips on your favorite one so lets get this party started . plans are done . I will be putting the C&O 490 , SP Daylight , NYC Mercury , lehigh valley John Wilkes , Hiawatha Milwaukee road , N&W J 611 and many more as i build the layout i build up the more rolling stock . So thanks for watching and hope you enjoy ..
Interesting concept and you have a very nice space!

Dave LASM
 
Eastern section construction started . base is in 4" lower then the center this will be the part that goes across the Ohio river to the Covington KY side so some elevated track and bridge work on this side
 

Attachments

  • 20240117_194259.jpg
    20240117_194259.jpg
    346.1 KB · Views: 41
  • 20240117_194252.jpg
    20240117_194252.jpg
    272.7 KB · Views: 39
  • 20240117_194239.jpg
    20240117_194239.jpg
    286.1 KB · Views: 42
Last edited:
Well got some work done on the Eastside of the layout .This will have both bridges that cross the ohio river and section of the raised track just south of the depot. Had to put some rail and trains on it to get the feel for the height. Open space is where the river will lay . Hope you guys are enjoying the the pic
 

Attachments

  • 20240121_162153.jpg
    20240121_162153.jpg
    170.7 KB · Views: 39
  • 20240121_162212.jpg
    20240121_162212.jpg
    288.4 KB · Views: 37
  • 20240121_162615.jpg
    20240121_162615.jpg
    247.8 KB · Views: 41
  • 20240121_164359.jpg
    20240121_164359.jpg
    247.6 KB · Views: 38
  • 20240121_164515.jpg
    20240121_164515.jpg
    227.8 KB · Views: 41
I think that may be the first time I have seen metal framing. Very interesting; I had never considered that.
Great looking layout. Can't wait to see more!
I like the metal . It's straight, light and you can make I beams that will support some series weight.
 
Well tonight I started to lay some track just lightly tacked down to look at transition from main to sidings and to run my push engine around and feel how smooth they are so far its very nice
This is the turnouts going in to track one of C.U.T. and the post office .

CODE 83 ATLAS FLEX
WALTHERS TURNOUTS
MIDWEST CORK BED
 

Attachments

  • 20240130_192737.jpg
    20240130_192737.jpg
    260.5 KB · Views: 31
  • 20240130_192545.jpg
    20240130_192545.jpg
    225 KB · Views: 29
  • 20240130_192526.jpg
    20240130_192526.jpg
    253 KB · Views: 29
  • 20240130_192504.jpg
    20240130_192504.jpg
    289 KB · Views: 30
  • 20240130_192336.jpg
    20240130_192336.jpg
    345.9 KB · Views: 29
  • 20240130_192249.jpg
    20240130_192249.jpg
    188.3 KB · Views: 29
  • 20240130_192235.jpg
    20240130_192235.jpg
    254.3 KB · Views: 29
Last edited:
Well got some trains on the rails to test also a little paint . As you can see the pink that is still showing will be the concrete platforms of union Station. Open hole will be filled with 2" pink foam for the coach yard,round house and coach shop . Be a lot of ballast and gravel . I need to find some good photos of the area for all the detailed stuff and true round house details
 

Attachments

  • 20240203_195744.jpg
    20240203_195744.jpg
    239.9 KB · Views: 32
  • 20240203_114511.jpg
    20240203_114511.jpg
    227.4 KB · Views: 31
  • 20240203_114445.jpg
    20240203_114445.jpg
    258.1 KB · Views: 32
  • 20240203_114415.jpg
    20240203_114415.jpg
    253.5 KB · Views: 32
  • 20240203_114359.jpg
    20240203_114359.jpg
    293.4 KB · Views: 31
  • 20240203_084407.jpg
    20240203_084407.jpg
    307.2 KB · Views: 27
Had to get some trains in the terminal to test turnouts and have a little fun . It can't be all work and no play !! . Going to be building west loop frame this week.
Glad you guys are enjoying the ride with me , turntable ,roundhouse ,turnouts and track ordered. And one new steamliner on its way ..surprise coming!! Can't wait
 

Attachments

  • 20240218_151252.jpg
    20240218_151252.jpg
    182.5 KB · Views: 28
  • 20240218_151354.jpg
    20240218_151354.jpg
    245.2 KB · Views: 31
  • 20240218_151321.jpg
    20240218_151321.jpg
    204.7 KB · Views: 32
  • 20240218_151216.jpg
    20240218_151216.jpg
    187.4 KB · Views: 32
  • 20240218_151209.jpg
    20240218_151209.jpg
    217.4 KB · Views: 30
Well started the framing on the west wing . This is the coal mining side of the layout bench is rising at 1/4 per for slope up in to the mountains .
 

Attachments

  • 20240220_210604.jpg
    20240220_210604.jpg
    162.6 KB · Views: 22
  • 20240220_210526.jpg
    20240220_210526.jpg
    179.5 KB · Views: 21
  • 20240220_210501.jpg
    20240220_210501.jpg
    170.1 KB · Views: 22
Decking going down . A little each night and we have all the framing done and base laid hope to be laying cork this weekend . Trying to keep a good time line true to the build .
 

Attachments

  • 20240221_210136.jpg
    20240221_210136.jpg
    310 KB · Views: 20
  • 20240221_210059.jpg
    20240221_210059.jpg
    219.4 KB · Views: 17
  • 20240221_210010.jpg
    20240221_210010.jpg
    233.3 KB · Views: 19
  • 20240220_210604.jpg
    20240220_210604.jpg
    162.6 KB · Views: 29



Back
Top