Here is the Outer End Wall for the Lower Coal Bunker Section. It has some access doors. The Brick Wall was also sprayed Primer Grey with the Roll-up Door and Personel Door begin sprayed a lighter grey.
Here is the Lower Coal Bunker Assembly. The Coal Bunker will sit ontop of the supports at the top
The Coke Oven Walls have been sprayed a rust color while the Brick Oven Walls were sprayed the grey primer color.
Oven Top has been sprayed a tan color and glued in place ontop of the oven walls. The Oven Top will be weathered with bits of brown, black, orange, and red colors and the walls will be weathered the same way.
Here is the top portion of the Coal Bunker which has been sprayed the rust color. The black part is where it will be sprayed an aluminum color as it is aluminum siding.
Aluminum Siding sprayed.
Added the roofs to the Coal Bunker. The opening is for the conveyor that will come from the Crushing House.
Governor House has been built and sprayed several diff colors including Rust color for the support structure, Silver for the aluminum sheeting walls, and grey for the door to the Governor House
Governor House Rear. You can see the Collector Pipe going in the Governor House.
Lower Crusher House Walls. They have been sprayed an aluminum color. That is an access door were the hole is and on the other side is where the conveyor goes out from to go to the top of the Coal Bunker