Waggs
New Member
Hi all, I need some help and advice. I few days ago I bought some buildings from a seller on Ebay. I received them in the mail on Thursday. Of all the 89 or nine I got there was one that really needed help. 3 of them were still in kit form and 4 of them were built ok but I plan on adding some glue just to reinforce everything. But this one has some real problems. First off, every glue joint was really loose, secondly there were odds and ends glued about like it was suppose to be freight or something, and third, there's a big gaping hole that looks like it was suppose to have another building there or something. I have no idea what so I'm going to ask for help in telling what may have gone there or what to do with this hole. I was thinking of trying to find something that would make it look like a dump site for a bottom dump rail car to pull up on and drop its load and then out to the side have some storage silos or something to kind of make it fit together. If I do this, where would I find some sort of grating or what can I get away with using. Next, I would need to add an auger to carry the payload to the silos, any suggestions?
Thank so much for letting me pick your brains.
Thank so much for letting me pick your brains.