Part 2 of the update
I started the last section of phase 2.Track is going south to Dawson Creek interchange with the CN...there will be only a few buildings and a lot of nature....corkbed is glued in place have to glue down the track and add the feeders.Background is installed and have to painted.
I added a liftout in front of the door.Here are some pictures
The track will curve to the right side to Dawson Creek station.
the liftout..
Now I´m able to place some of my favourite structures to the layout,a gasstation,a diner and a small scrapyard with used and rusted cars and other things...
I made some small chages to this section and laid tracks around the edge of the room into the other one and made the benchwork for the Dawson Creek interchange above the TV.
before the change
and after
New place for the Fred & Red´s Cafe
curve around the corner with some rough foam scenery
and into the other room for the interchange.It will be a small two track yard and some warehouses etc.....
The interchange will be used for an just to buy GP9.that will be decaled and painted in NAR colors...there will be rolling stock from CN and some NAR.I`ll use it for staging and it will be the connection to the rest of the world on that side of the layout....So I´ll be able to run some other rolling stock than only PGE/BCR...
Track was laid and power is up to that point.I got some trains running all the way up from Chetwynd to Dawson Creek interchange without any major problems.
Played around with some structures and rough scenery.There will be a short two track yard in front of the window build as a liftout.
Left side there is the Walther sunrise Mill with some Silos
Maybe I´ll cut the Silos into two and add a second spur for unloading grain to the elevator in an closed shed.
one the right side there will be an Grain elevator with some surrounding buildings...
In the background there will be three of the Walthers Parkview terrace background flats and in the front ther will some soon to be named industries
And here is an overall view of this section...I´ll build a small removable two track staging to the left in front of the window...
So that´s all for now,I´ll hope to start with some scenery ,soon.
Any tips and comments are very appreciated...
Regards,Chris
I started the last section of phase 2.Track is going south to Dawson Creek interchange with the CN...there will be only a few buildings and a lot of nature....corkbed is glued in place have to glue down the track and add the feeders.Background is installed and have to painted.
I added a liftout in front of the door.Here are some pictures
The track will curve to the right side to Dawson Creek station.
the liftout..
Now I´m able to place some of my favourite structures to the layout,a gasstation,a diner and a small scrapyard with used and rusted cars and other things...
I made some small chages to this section and laid tracks around the edge of the room into the other one and made the benchwork for the Dawson Creek interchange above the TV.
before the change
and after
New place for the Fred & Red´s Cafe
curve around the corner with some rough foam scenery
and into the other room for the interchange.It will be a small two track yard and some warehouses etc.....
The interchange will be used for an just to buy GP9.that will be decaled and painted in NAR colors...there will be rolling stock from CN and some NAR.I`ll use it for staging and it will be the connection to the rest of the world on that side of the layout....So I´ll be able to run some other rolling stock than only PGE/BCR...
Track was laid and power is up to that point.I got some trains running all the way up from Chetwynd to Dawson Creek interchange without any major problems.
Played around with some structures and rough scenery.There will be a short two track yard in front of the window build as a liftout.
Left side there is the Walther sunrise Mill with some Silos
Maybe I´ll cut the Silos into two and add a second spur for unloading grain to the elevator in an closed shed.
one the right side there will be an Grain elevator with some surrounding buildings...
In the background there will be three of the Walthers Parkview terrace background flats and in the front ther will some soon to be named industries
And here is an overall view of this section...I´ll build a small removable two track staging to the left in front of the window...
So that´s all for now,I´ll hope to start with some scenery ,soon.
Any tips and comments are very appreciated...
Regards,Chris