Patrick
Alien Attitude.
Willie: I have a few pieces of sectional track in the layout. I have them on the ends of the layout at the bridges. It made where the bridges attach and get power easier and more stable for running the trains. I got some new 1/3 sections of straight in the last auction I got. I found them handy for this job. The bridges themselves have flex.
About 90% of my trackage is flex. The stuff I peeled off the full layout I got in 2012, was all soaked in warm soapy water and then scrubbed with a soft brush to get the glue and ballast off the track. After this long, it's long dry and still works fine.
About 90% of my trackage is flex. The stuff I peeled off the full layout I got in 2012, was all soaked in warm soapy water and then scrubbed with a soft brush to get the glue and ballast off the track. After this long, it's long dry and still works fine.