Transition from foam to 3/4" plywood


tlark

Member
Adding on to existing portion of layout where the roadbed is built up on about 5" inches of the high density blue foam that's commonly used. Only about 16-18 inches of this area built up which will lead to this new section in which I will use 3/4 plywood. Any concerns or experience is welcome from anyone that has done this before. Any need to worry about warping track or expansion outside what normal. Only 1 track, not like a yard section.

Thanks in advance.
 
I wouldn't worry too much about warping or expansion unless your layout is in an uncontrolled environment. Just make sure you don't have a track joint over the transition.
 



Back
Top