Looking for the name and description of that 'wheeled type' tool that would mark the centerlines of track onto the subroadbed of plywood thru the paper pattern lying on the plywood.
I have most of my track plans drawn out full scale onto brown 'construction paper', and now I wish to start laying track onto the plywood deck, but can't leave the paper pattern under the track.
http://www.modelrailroadforums.com/...full-size-paper-templates-of-trackplan.30958/
I have most of my track plans drawn out full scale onto brown 'construction paper', and now I wish to start laying track onto the plywood deck, but can't leave the paper pattern under the track.
http://www.modelrailroadforums.com/...full-size-paper-templates-of-trackplan.30958/