I am in the middle of installing my sub-roadbed on my N-scale layout. I am using 1/4" luann strips cut to hold Kato Unitrack. In one area of my layout I have a bridge that crosses the track over another track. My overall plan will be to have intermodal at some point after layout is running. I do not have any on hand so I am hoping someone can tell me what the clearance distance needs to be for a double stack husky well car to clear under the bridge. May run TOFC but don't think they are as tall. Need distance between TOR and bottom of bridge.
Thanks,
Jeff
Thanks,
Jeff