Here are some updates:
DP 6244 Weed Cutter Snow Plow - this has been running all week, right now the rear will be done tonight, as of this morning the CNC passed 1.29 million lines of code out of 1.56 million required to do the rear final pass. I was in a catch 22 here, the faster tool path's would omit some detail so I stuck with the "hybrid" which enables all of the features to be formed correctly. The rear is not fast because the cutter has to go around all of the surface detail that forms the mount for the plow. The next plow will be next DP 6240 CN Snow Plow. I am waiting on a 0.5MM flat from Hitachi to restart the hood sides. If the weed cutter file is finished before it arrives, the second plow file will be started.
Hood Sides - all of the dash two versions are programmed. I have material now in hand for 25 sheets. Yield is 9 kits per sheet. After the Weed Cutter Snow Plow and the 0.5MM Flat arrives, I will start running production. Will be sometime this week.
In the mean-time, get the orders in. Here are some images with a sample and Cannon components installed. This will easily beat anything including the new "Genesis" units coming out of China. I managed to see a new Athearn GP38-2W up close this week, all I can say is the only way to get an accurate model is to use our products. You can also see the DP 6209 SD D2 Walkway Duct in these images. Just a reminder, the file has been corrected so the walkway light behind the walkway duct will be machined down to show the lip around the hole, and bolt detail.
In addition to the hoods, I am working on files for the rear hood. Though the Cannon parts will work, the detail on the bottom around the access doors in our product will be a better representation for the prototype. It will also be drilled for grab locations, you can use our scale grab irons and the walkway light will be cut so you can light up the rear deck.
The next project I am starting to set up is to replace two lost moulds, the stanchions. The new version will be micro-machined metal. I will be able to run a test for them this week and start production next week.
The new fuel tanks will be programmed for production. Here is the sample for the SD40-2W.
So to recap:
DP 6244 Weed Cutter Snow Plows - In production.
Dash 2 Hood Sides - Will start production this week.
Stanchions - Testing this week.
DP 6240 CN Snow Plow - Production either this week or after the hood sides.
Rear Hoods - Fixture and part designed for testing, production afterwards.
I also have material for the decks and a frame test.
The locomotive kits right now are:
New Hood Sides - done in 1 - 2 weeks
Rear Hood - done in 1 - 2 weeks
New Frames - done in 2 - 4 weeks
New Fuel Tanks - done in 2 - 3 weeks
New Decks - done in 2 - 4 weeks
New Pilots/Step Wells, Bolster Plates, Hood Weights - testing over the next two weeks
New Stanchions - done in 2 - 4 weeks, handrails for the "Wide Cabs" are done and in stock
The next batch of parts will be the trucks and drive. Along with some injection mould tooling.
The DCC/dWiDCC is less than $500 away from starting programming.
That's about it for now. Also going to test a new tread plate product that is made from machined styrene.
Christopher Howard, Railflyer Model Prototypes Inc.