Modell Railroad Links

Page 39 of 39 FirstFirst ... 29373839
Results 381 to 390 of 390

Thread: Building the Canyon Diablo Bridge

  1. Default

    Five million rivets!
    Attached Thumbnails Attached Thumbnails Click image for larger version. 

Name:	20170620_163905.jpg 
Views:	40 
Size:	588.7 KB 
ID:	61975  

  2. #382
    Join Date
    Jun 2012
    Location
    Caboolture in SE Queensland, Australia
    Posts
    7,409

    Default

    Shudder!!!
    CONVICTED SERIAL KIDDER

    I'm lost. I've gone to look for me. If I should return before I get back, please ask me to wait.

  3. #383

    Default

    Yeah, I haven't touched the model now for about three weeks. Just overcome with other priorities.
    Ken
    When ya absolutely positively need model railroad fun, choose the D&J Railroad.


    Visit the progress of the construction of the D&J Railroad at:
    http://www.modelrailroadforums.com/f...-From-Scratch]

  4. #384
    Join Date
    Aug 2016
    Location
    Central Minnesota, Park Rapids area.
    Posts
    1,287

    Default

    October 2nd, 2017. Are we ready to get going, again?
    Mark D.

    Opinions given are my own and not meant to ruffle any feathers.
    Northern Pacific, really terrific!

  5. #385

    Default

    Hi Mark. No, haven't touched it yet. Just way to much other stuff going on.
    Ken
    When ya absolutely positively need model railroad fun, choose the D&J Railroad.


    Visit the progress of the construction of the D&J Railroad at:
    http://www.modelrailroadforums.com/f...-From-Scratch]

  6. #386

    Default

    Fiiinnnnaaallllllyyyyy sat down and did a little work on the bridge this afternoon.
    This little bit of work, installing the inspection outboard walkway with handrails, took about 1 1/2 hours. There are a lot of steps that I did out of sequence which is why it took so long. I still have to trim away the excess material from the uprights and then do the same type of platform on the other side of the bridge. Two more will have to be installed at the other end too.

    Click image for larger version. 

Name:	Inspection Walkway.jpg 
Views:	11 
Size:	451.3 KB 
ID:	63353
    Ken
    When ya absolutely positively need model railroad fun, choose the D&J Railroad.


    Visit the progress of the construction of the D&J Railroad at:
    http://www.modelrailroadforums.com/f...-From-Scratch]

  7. #387

    Default

    That is some really tedious work, but well done. AT my age I don't think I would even attempt anything like this.

    Nice to see you getting back to the bridge. Too nice of a feature for your empire not to complete.

  8. #388
    Join Date
    Jun 2012
    Location
    Caboolture in SE Queensland, Australia
    Posts
    7,409

    Default

    Good to see progress. Up and at'm.
    CONVICTED SERIAL KIDDER

    I'm lost. I've gone to look for me. If I should return before I get back, please ask me to wait.

  9. #389

    Default

    Looking good!
    I don't suffer from insanity; I enjoy every minute of it.
    -----------------------------------------------------------------
    If the women don't find ya handsome, they should at least find ya handy! Red Green
    http://theworldasiseeit-flyboy2610.b...-i-see-it.html

  10. Default

    RA - RA - BOOM-T-AY yeah Man!
    **********
    Sherrel
    I survived Charles Tillinghast & Carl Ican
    Here, hold my beer!

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •