Modell Railroad Links

Page 47 of 48 FirstFirst ... 3745464748 LastLast
Results 461 to 470 of 479

Thread: Hawks NEW "MHO Junction" layout

  1. Default

    Quote Originally Posted by Hawkesburytrain View Post
    Thanks everyone,

    Alex, Jon is right, I use static grass, different heights and color
    Thanks - I've seen pictures of static grass, but I guess never so close up or the length. It looks really good!

  2. Default

    Done a bit of work on my future brewery. Here's a stair case which will access 3 floors and the roof (build from scratch).
    Had to redo the steps because I missed calculated the number of steps.

    Click image for larger version. 

Name:	IMG_0232.JPG 
Views:	94 
Size:	768.0 KB 
ID:	63915

    Click image for larger version. 

Name:	IMG_0245.JPG 
Views:	92 
Size:	761.3 KB 
ID:	63916


    Click image for larger version. 

Name:	Stair case.jpg 
Views:	93 
Size:	317.8 KB 
ID:	63917

    I also included 2 pictures of what I want it to look like. Still plenty of work to be done.

    Click image for larger version. 

Name:	coors building6.jpg 
Views:	90 
Size:	515.6 KB 
ID:	63914


    Later

  3. #463

    Default

    I have been following but not commenting until this scratch build. Nice work.
    ................................ Chet


    Video - Switching in Churchill - https://www.youtube.com/watch?v=YR-tYl9fd9s
    VIDEO Tour of the layout - https://www.youtube.com/watch?v=qiNqrkq9xYY
    New cab ride - https://www.youtube.com/watch?v=QiL7SgH6Wbw

  4. #464

    Default

    Excellent work Lloyd and it is going to be an impressive building.
    Cheers,

    Tony
    (aka wombat457)

    "...knowing what to do is one thing, being able to do it is another..."

    http://www.modelrailroadforums.com/f...Indoor-N-Scale

  5. Default

    Thank you both.
    I needed to get more work done on this brewery as it might take a bit more than a year or two to build.

  6. #466

    Default

    A year or two to build - hope your not talking about a real year or two. By the time you finish it, you'll need to do modifications to it
    Cheers,

    Tony
    (aka wombat457)

    "...knowing what to do is one thing, being able to do it is another..."

    http://www.modelrailroadforums.com/f...Indoor-N-Scale

  7. Default

    Quote Originally Posted by wombat457 View Post
    A year or two to build - hope your not talking about a real year or two. By the time you finish it, you'll need to do modifications to it
    Yes Tony, it will take about 1 - 2 years to build. Here's the plan of the 11' x 10' brewery

    Click image for larger version. 

Name:	Breweryy2.jpg 
Views:	53 
Size:	449.9 KB 
ID:	64031


    Finally got one wall (48 to go) of the brewery done, well not exactly, still need weathering. The staircase is almost done, I still need to fix a few things, do a bit of weathering and add the part that goes to the roof.
    I also need to do the motoring part of the freight door and match the light to it.
    I guess, I still have work to do.

    Click image for larger version. 

Name:	IMG_0249.JPG 
Views:	54 
Size:	819.1 KB 
ID:	64032


    Later

  8. #468

    Default

    WOW, just wow!

    Very nice work Lloyd.

    Jon...

  9. #469

    Default

    That looks awesome, looking forward to watching your build.

  10. Default

    Lloyd - Looking forward to this build. I remember your design stage (was it last year?) and wondered about it's progress. Note that it sometimes takes me a year or two to complete some projects as well, I'm not an instant gratification kind of person! That and I sometimes set things aside when I get frustrated with them and don't resume for a while.

    Willie

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •