Crossing upgrades


bob

Administrator
Staff member
All you guys are talking about working on your crossings and signals, so I thought I’d give it a try too.

Step 1 remove the old crossing

6F6CE1C6-8589-47F7-A4C7-8A33D2A06419.jpeg


3B67BDEF-BB2F-4B66-86BF-D33AA9541F9B.jpeg
 
Let’s see, is it pave then build track, or build track then pave? I can never remember...

5BC188D1-A1D2-495E-B945-DB9A0E32CAED.jpeg



The asphalt provides a solid base for the track structure.
 
Under layout wiring. We don’t mess with those tiny little wires you guys were fussing about. ;)

292F51B8-9E08-41D2-8614-46AB9EC113E9.jpeg
 
Hand laid track on real wood ties. (Yes, they do make “plastic” ties, a mix of resin and wood chips, we don’t use them.)

2D1C1AA5-4ABE-427A-8D0A-7A0E0CE9569C.jpeg
 
Sure, we can do that. You won’t like the prices though, these guys aren’t cheap!
 
Joking aside, we did build a short chunk of 3 foot gauge for a museum a few years back. Smallest track we’ve ever built.
 
And the finished product. All in one (very long) weekend!

8754EF39-2A71-4F43-A850-4C588870EE93.jpeg


666BB3B3-5815-40B3-924A-5D353C893E83.jpeg
 
Last edited:
BOB ... What kind of material is that which is used to protect the flangeways?
Looks like some sort of rubberized stuff?
 
Nice series of photos. Saw the same thing going on locally at a crossing. They sure get it done in a hurry, not like state employees.
 



Back
Top