logandsawman
Well-Known Member
Here I do a little talking about assembling my new layout, getting started on the first tracks, getting the grades the way I want them.
You may notice at one place I said 1% grade but I meant to say 2%. This is about 1/4" rise per foot.
[video=youtube;JCTcpJ2Ffe8]https://www.youtube.com/watch?v=JCTcpJ2Ffe8&list=UUhIOAl4aYtSk3awwn0vR00g&index=1[/video]
Thanks for Watching, lasm
You may notice at one place I said 1% grade but I meant to say 2%. This is about 1/4" rise per foot.
[video=youtube;JCTcpJ2Ffe8]https://www.youtube.com/watch?v=JCTcpJ2Ffe8&list=UUhIOAl4aYtSk3awwn0vR00g&index=1[/video]
Thanks for Watching, lasm