I am curious, with all the pics of benchwork I have seen, I notice alot of guys are laying strips of plywood about 3-4" wide on top of the framework, laying cork over that and then track on top. If the framework is lets say 18-24" wide, but you only have 1 strip of plywood for a subroadbed, how...