We are still looking for some more Purple Rock Cress, to make a more solid boundary between the plants and the ballast. Other than that, for now, the planting is done and we need to wait and let everything grow and spread. Next year, we can take another look and see if anything died and whether there are still spaces that could do with filling.

obsy600.jpg


There's one chair screw left to fit on the rear sleeper - the "Golden Spike" to complete the railway. I need to drill the sleeper for this, then the family will all take turns on the two feet stilson wrench, to complete the railway! I'm looking forwards to the Summer, leaning on my crossing gate, with a cold drink in my hand, watching the buzzy things going mental around all the flowers!!

obsy601.jpg
 
I've followed your adventure from the beginning, but I do not recall if you ever mentioned whether or not you were going to add a railcar to this railway at any time. ???
 
April 19th

Funny how life is circular. When the old Victorian school was knocked down in 1969, to make way for our house, the site was around one acre, with the bungalow only taking up a small part of that plot. The rest of the land was used as a plant nursery.

Here we are in 2024, with plant production now going into industrial levels to fill the garden. We've multiple seed trays on the go, which have started to come to life in the last week. Having already spent around £200 on plants for the railway and path, I'm now looking for a cheaper source to fill in gaps.

obsy603.jpg


The postman also brought another box of twelve Purple Rock Cress plants. Right now, they are tiny, but they will go along the edge of the railway to complete a solid line of these plants as a barrier between the ballast and embankment. With night time frosts still possible, I've potted them for now, until we can be sure the frosts are behind us. Lynne was fretting a couple of nights ago, that we might loose £200 of plants to a late frost!

obsy604.jpg


In the picture below, I've got three pots of Forget-me-nots, pulled from the lawn and the grass separated from them. To their right, in the Flash box, are three pots of wildflower seeds. I think the seeds are tiny, so the box has a white powder mixed in to help to show where they've been spread. With it being still cold outside, I planted some in pots, kept indoors, to see if anything would emerge from the powder mix!

The remaining two pictures are Candy Tuft seedlings, which were big enough to separate from the seed trays and plant in their own pots. The Slushy pots, complete with lids, make quite nice mini greenhouses which also helps to keep the moisture in. The open top still allows fresh CO2 in, for the leaves to breathe. I'm interested to know if those with lids grow faster or slower than the others.

obsy605.jpg
 
April 20th & 21st

The clear Friday night developed into a clear, calm and dry weekend, so it was time to get back to the wall. I've built walls before at the Washington house. Made from modern metric bricks, they turned out so neat, that some people thought the pictures were CGI of what I planned to build. This wall isn't like that at all.

The bricks are Victorian, dating from around 1860, appear hand made. Some are huge, around four and a half to five inches wide in places and none are exactly the same size, nor have flat faces. Some are bulged, some are con-caved, the ends aren't necessarily square and the proportions aren't right for the length of one brick, to work with the width of two bricks for the pillar.

All of this is made laying them a real challenge. Straight and level needs to be an average, as a small level won't sit flat on any of the bricks! Several bricks broke or crumbled during dismantling of the wall, so multiple half bricks were used on the far side, below ground level. They are all being reused from the original wall, so all are stained from age or lime mortar. I may try cleaning them once the wall is finished.

By the end of Saturday, I had four courses added on the front and two on the back.

obsy606.jpg


My back really didn't want me to go back out on Sunday, but I couldn't waste another good weather day. Another two courses were added to the front, with four at the back, though every fourth layer has the bricks laid across the wall, to tie the two sides together. It was all covered in plastic by the end of the day, as the rain came back that evening and has continued on and off to today. Lynne also gave the lawn its first cut of the year. It was still a bit wet, but had got so long, it took her two hours.

I'm hoping a rotary wire brush or grinder can clean off the bricks a bit. A quick test seemed to suggest that would work, but they've got 150 years of weathering to catch up on to match the rest of the wall - which also needs pointing. Yet another job!

obsy607.jpg
 