Tie Distressing
Trying to show the distressing done on a few ties just prior to the start of the Curved switch leading to the Serpha Copper & Iron Works and Anglin Oil Works as well as the Noth South Main Line and the Anglin Oil loading facility sideing for more convient loading through the overhead pipe lines, to be instlled later.

Note that in my hurry I didn't even break the edge of the cork RB at the switch yet, good thing things are fastened down yet.
There are no comments to display.

Media information

Category
Benchwork, Roadbed and Track Construction Photos
Added by
Trussrod
Date added
View count
2,398
Comment count
0
Rating
0.00 star(s) 0 ratings

Share this media




Back
Top