Lebovitz Central RR project
M

Lebovitz Central RR project

This is a project layou that I am building for a client. It is a 6'x12' table with the Lionel Fastrack system.
These are pictures from the first day of reconstruction. The left side of the layout will be a raised city. The right side will be a Mountain with a tunnel. I moved all the possible problem switching areas to the front of the layout. The back track is elevated 2" to give the future river somewhere to go.
There are no comments to display.

Media information

Category
Scenery and Foliage Details
Added by
Myowngod
Date added
View count
3,427
Comment count
0
Rating
0.00 star(s) 0 ratings

Share this media




Back
Top