A 50 car train rounds the curve formed as a result of my only major departure from the prototype. The track should bend to the right here and continue onto what would have to be a duck-under that would include Salt Creek Trestle over the isleway in its path to the south canyon wall. I figure a 70" limbo test to be the best I'll be able to handle by age 65. So I also figure ducking under a 45" barrier at 65 years old is model railroadings punishment for construction delays and, no doubt, leading to a major embarrasement.
Also evident, in its mid-stages, are my first attempts in scratchbuilding fir trees. A mojor story in itself!